Yaskawa Sigma-5 User Manual: MECHATROLINK-II Commands Manual do Utilizador Página 25

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 142
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 24
2 Operation Sequence
2.1.2 Checking the Communications Status
2-8
2.1.2 Checking the Communications Status
Turn ON the control and main circuit power supplies and use the following procedure to confirm that the SER-
VOPACK is ready for communications.
(1) Operation Procedure
When the Σ-V Series SERVOPACKs (SGDV-A11, -A15, -D11,
-D15, -F11, -F15) or the Large-Capacity Σ-V Series SERVOPACKs
(SGDV-H11, -J11) are Used
When the DC Power Input Σ-V Series SERVOPACKs (SGDV-E11) are Used
Procedure Operation
1 Confirm that the wiring is correctly made.
2
Turn ON the SERVOPACK control and main circuit power supplies.
When the control power is being normally supplied to the SERVOPACK, POWER LED on the SERVO-
PACK is lit.
When the main circuit power supply is ON, CHARGE is lit.
3 Turn ON the controller power supply and start MECHATROLINK communications.
4
Check the communications status.
When communications in the data link layer have started, COM LED on the SERVOPACK is lit.
Note: If COM LED is not lit, check the communications settings of SW1, SW2, and the controller, and then
turn the power supplies OFF and ON again.
When the MECHATROLINK-II connection in the application layer is established, the 7-segment LED indi-
cates the completion of CONNECT execution as shown below.
Procedure Operation
1 Confirm that the wiring is correctly made.
2 Turn ON the SERVOPACK control and main circuit power supplies.
3 Turn ON the controller power supply and start MECHATROLINK communications.
4
Check the communications status.
When communications in the data link layer have started, COM LED on the SERVOPACK is lit.
Note: If COM LED is not lit, check the communications settings of SW1, SW2, and the controller, and then
turn the power supplies OFF and ON again.
When lit: CONNECT execution completed
When unlit: CONNECT execution not completed
When lit: During data link communications.
When unlit: Communications not established.
Vista de página 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 141 142

Comentários a estes Manuais

Sem comentários